Cotoneaster microphyllus
Genus Cotoneaster
Two sources report 7 treatments between them. All are shown.
Protocol 1
DerivedN. C. Deno, 1996Difficulty High Rated by us, not by the source.
Start around July 23, 2027 for a May 3 last frost. Too late for spring 2027 — that needed starting on July 22, 2026.
- 1
Cold moist stratification
Duration: 90 days · Temperature: 40°F 4°C
- 2
Warm moist stratification
Duration: 90 days · Temperature: 70°F 21°C
- 3
Cold moist stratification
Duration: 90 days · Temperature: 40°F 4°C
- 4
Warm moist stratification
Duration: 90 days · Temperature: 70°F 21°C
2 germinated in this phase.
Steps after step 2 run on after germination.
about 6 months from start to sowing. Then 77 days to germinate.
29% germination in 14–77 days.
Protocol 2
DerivedN. C. Deno, 1996Difficulty Moderate Rated by us, not by the source.
Start around August 6, 2027 for a May 3 last frost. Too late for spring 2027 — that needed starting on August 5, 2024.
- 1
Dry storage
Duration: 730 days · Temperature: 70°F 21°C
- 2
Cold moist stratification
Duration: 90 days · Temperature: 40°F 4°C
- 3
Warm moist stratification
Duration: 90 days · Temperature: 70°F 21°C
about 2.5 years from start to sowing. Then 63 days to germinate.
46% germination in 7–63 days.
Protocol 3
DerivedN. C. Deno, 1996Difficulty High Rated by us, not by the source.
Start around October 27, 2026 for a May 3 last frost.
- 1
- 2
Warm moist stratification
Duration: 90 days · Temperature: 70°F 21°C
- 3
Cold moist stratification
Duration: 90 days · Temperature: 40°F 4°C
- 4
Warm moist stratification
Duration: 90 days · Temperature: 70°F 21°C
3 germinated in this phase.
Steps after step 2 run on after germination.
about 3 months from start to sowing. Then 70 days to germinate.
40% germination in 28–70 days.
Protocol 4
DerivedN. C. Deno, 1996Difficulty Very high Rated by us, not by the source.
Start around December 15, 2026 for a May 3 last frost.
- 1
Warm moist stratification
Duration: 90 days · Temperature: 70°F 21°C · Light: dark
- 2
Cold moist stratification
Duration: 90 days · Temperature: 40°F 4°C
- 3
Warm moist stratification
Duration: 90 days · Temperature: 70°F 21°C · Light: dark
Steps after step 1 run on after germination.
about 3 months from start to sowing. Germination time not stated; 21 days assumed.
2% germination.
Protocol 5
DerivedN. C. Deno, 1996Difficulty Moderate Rated by us, not by the source.
Start around January 26, 2027 for a May 3 last frost. Too late for spring 2027 — that needed starting on January 25, 2025.
- 1
Dry storage
Duration: 730 days · Temperature: 70°F 21°C
- 2
- 3
Sow and cover
Temperature: 70°F 21°C
about 2 years from start to sowing. Then 70 days to germinate.
40% germination in 28–70 days.
Protocol 6
DerivedN. C. Deno, 1993Difficulty Very high Rated by us, not by the source.
Start around March 15, 2027 for a May 3 last frost.
- 1
Sow and cover
Temperature: 70°F 21°C · Light: dark
No stated waiting before sowing. Germination time not stated; 21 days assumed.
2% germination.
Protocol 7
DerivedN. C. Deno, 1993Difficulty Moderate Rated by us, not by the source.
Start around January 25, 2027 for a May 3 last frost.
- 1
- 2
Sow and cover
Temperature: 70°F 21°C · Light: dark
No stated waiting before sowing. Then 70 days to germinate.
40% germination in 28–70 days.