Protocol 1
DerivedN. C. Deno, 1993Difficulty High Rated by us, not by the source.
Start around June 26, 2027 for a May 3 last frost. Too late for spring 2027 — that needed starting on June 25, 2026.
- 1
Warm moist stratification
Duration: 90 days · Temperature: 70°F 21°C
- 2
Cold moist stratification
Duration: 90 days · Temperature: 40°F 4°C
- 3
Warm moist stratification
Duration: 90 days · Temperature: 70°F 21°C
about 9 months from start to sowing. Then 14 days to germinate.
40% germination in 14 days.
Protocol 2
DerivedN. C. Deno, 1993Difficulty High Rated by us, not by the source.
Start around September 23, 2026 for a May 3 last frost.
- 1
Cold moist stratification
Duration: 90 days · Temperature: 40°F 4°C
- 2
Warm moist stratification
Duration: 90 days · Temperature: 70°F 21°C
- 3
Cold moist stratification
Duration: 90 days · Temperature: 40°F 4°C
1/5 germinated in this phase.
Steps after step 2 run on after germination.
about 6 months from start to sowing. Then 14 days to germinate.
20% germination in 14 days.